West Project

PROJECT 1

Location: This portion of the work is generally bound by Rowland Blvd. on the North, Ignacio Blvd. on the South, Highway 101 on the East, and Marin Country Club on the West.

Construction Duration: November 2016 – July 2017

Typical Working Hours:  8:00 AM to 5:00 PM, Mon.-Fri.

Project Highlights: Installation of 3.8 miles of 12-inch and 8-inch diameter recycled water pipeline along S. Novato Blvd. near Lynwood School to Rowland Blvd., along Rowland Blvd. to Redwood Blvd., south on Redwood Blvd. to the southerly end of S. Novato Blvd. and along the bike path to Entrada Drive to Ignacio Blvd. ending near Country Club Drive. A 16-inch pipe will be installed by drilling from Entrada Drive to Norman Tank.